Downer

Mount Maunganui Bitumen Plant

We were the head mechanical contractor for Downer EDI’s recent Mount Maunganui Bitumen Plant upgrade. The project took place over seven months and timing was critical as Downer needed to take delivery of raw materials from offshore in time to meet production requirements for the new roading season. Construction of six new API 650 Storage tanks and pipe spooling for thermal heating and product was carried out in our Mount workshops prior to the plant being shut down.

The Project involved demolition of the existing facility so that installation of tanks, mechanical equipment and piping could take place; a new emulsion plant was also installed by us as part of the project. Major refurbishment of the existing tanks on site was also undertaken so that they could meet current code compliance. The Project was completed on time and under budget with zero lost time or medically treated injuries.

Fulton Hogan

Mount Maunganui Bitumen Plant

Fulton Hogan contracted us to construct an 11,000m³ API 650 Storage Tank and carry out a full plant upgrade for their Mount Maunganui bitumen plant. Fulton Hogan made a corporate decision to upgrade the plant to meet current  environmental and health and safety standards which involved demolition of much of the existing plant and installation of new plant and equipment. We delivered the construction of the storage tank and the plant upgrade on a tight time frame so that Fulton Hogan could meet its obligations to their customers on time.

The project involved construction and erection of several pipe bridges, replacement of thermal oil and product pipe work and installation of mechanical equipment associated with the plant. Due to its prominent position on Mount Maunganui’s main industrial route from the Port of Tauranga this will remain one of our iconic  projects.

BP Oil New Zealand Ltd

Napier Terminal

We were the head contrator for BP Oil New Zealand Ltd at recenttheir Napier Terminal. This involved the fabrication and installation of new fire system and product piping, fabrication and installation of a new 200,000 litre Slops Tank, refurbishment of the existing Petroleum Storage Tanks and carrying out of associated civil works. 

NEWS : Gull Petroleum

We are pleased to announce we have been awarded the contract for the fabrication and installation of the new 1... more >>

VACANCIES : Fitter/Welder

We require experienced and highly skilled Fitter/Welders to ASME IX standards.  Applicants must have... more >>

PROJECTS : Te Mihi Steamfield

We were the mechnical contractors for Hawkins Construction who were the Head Contractors for Contact Energy's ... more >>

PRODUCTS : DCL Dust Controlled Load Spouts

Complimenting the Page Macrae's Hopper technology are these DCL Loading Spouts which are designed to effective... more >>

TEAM :

Page Macrae's success can be attributed to all of our team. Meet some of our key members...
more >>